The Project Fact Sheets

STRANGE LAKE RARE EARTH PROJECT

Written by Canadian Indigenous Investment Forum | Dec 4, 2025, 2:59:11 PM

Project Spotlight 

Strange Lake Rare Earth Project

Torngat Metals Ltd is developing a rare earth mining, processing, and separation project at Strange Lake in Nunavik (northern Quebec), with associated infrastructure in Labrador and a separation plant in Sept-Îles, at an estimated capital cost of CAD $2 billion. The project targets both heavy and light rare earth elements, with commissioning targeted for 2030.

The project has secured CAD $165 million in federal government financing from Export Development Canada and the Canada Infrastructure Bank (June 2025), and received up to CAD $10 million in pre-development funding from the Critical Minerals Infrastructure Fund (December 2024). The feasibility study was completed in the first half of 2026. Environmental impact assessments are targeted for submission in 2026.

Sources: Torngat Metals, project overview; CIB, Strange Lake press release, 23 June 2025; NRCan, CMIF announcement, 20 December 2024; Torngat Metals, CEO transition announcement, 17 March 2026

 

Overview 

The project comprises three components: an open-pit mine and concentration plant at Strange Lake in Nunavik; a seasonal access road and port facility connecting the mine to the Labrador coast; and a rare earth separation plant in Sept-Îles, Quebec.

Rare earth concentrates will be transported by road to a port facility at Voisey’s Bay, Labrador, shipped to Sept-Îles during the ice-free season, and processed into high-purity rare earth oxides at the separation plant. Annual production is targeted at approximately 15,000 tonnes of rare earth oxides, with heavy rare earth elements comprising over 50 per cent of output.

Sources: Torngat Metals, project overview; Torngat Metals, separation plant; Torngat Metals, access road and port

 

Key Facts

Category
Information
 Location
 Strange Lake, Nunavik (Quebec); Sept-Îles separation plant   (Quebec); Voisey’s Bay port (Labrador)  
 Proponent
 Torngat Metals Ltd  
 Lead Investor   Cerberus Capital Management (approximately US$60 billion in assets)  
 Capital Cost    CAD $2 billion (of which separation plant approximately CAD   $800 million)  
 Annual Production  
 Approximately 15,000 tonnes rare earth oxides  
 Product Mix  
 Dysprosium, terbium (heavy rare earths); neodymium,   praseodymium (light rare earths)  
 Mine Life    Multi-decade operation    
 Status  
 Feasibility study completed (March 2026); environmental impact   assessments underway  
 Target Commissioning    2030  
Sources: Torngat Metals, project overview; Torngat Metals, mine site; Torngat Metals, separation plant; Torngat Metals, Our Team; Cerberus Capital Management, Wikipedia, accessed October 2026


 

Development 

Torngat Metals was established to develop the Strange Lake project. Cerberus Capital Management invested USD $50 million in Torngat Metals in 2022, described by Torngat as the single largest rare earths investment in Canada.

The company is led by Maryse Bélanger as Chair of the Board and Interim Chief Executive Officer, and Olga Kovalik as Chief Operating Officer, who joined in April 2025. Yves Leduc served as Chief Executive Officer from March 2025 to March 2026, leading the company through the securing of CAD $165 million in government financing and the completion of the feasibility study. Bélanger was appointed Interim Chief Executive Officer in March 2026 following Leduc's departure. Dr Dirk Naumann, who served as President and Chief Executive Officer from 2018 to 2025, remains with the company as Strategic and Technical Advisor.

Sources: Torngat Metals, Meet the Team; Mining.com, Torngat Metals rare earths project revival, 10 July 2025; Torngat Metals, leadership appointments, 26 March 2025; Torngat Metals, CEO transition, 17 March 2026

 

 

Development Stage (September2026)

Status: Feasibility study completed; environmental impact assessments underway

  • Bankable feasibility study completed in the first half of 2026
  • Environmental impact assessments to be submitted to the governments of Canada, Newfoundland and Labrador, and Quebec in 2026
  • Construction expected to begin following issuance of required permits
  • Commissioning targeted for 2030
  • CAD $165 million in government financing secured (June 2025)
  • CAD $10 million CMIF pre-development funding approved (December 2024)
  • Offtake memorandum of understanding with Vacuumschmelze signed (August 2025)
  • Industrial partnership memorandum of understanding with Schneider Electric signed (June 2026)
  • Pre-Development Agreement signed with the Naskapi Nation of Kawawachikamach (announced February 2026)

Sources: Torngat Metals, project overview; Mining.com, feasibility study timing, 3 February 2026; Schneider Electric / Torngat Metals MOU, BusinessWire, 10 June 2026; Torngat Metals, CEO transition, 17 March 2026; Naskapi Nation, Pre-Development Agreement, February 2026

 

Timeline

Date
Milestone
 2022  
 Cerberus Capital Management investment (USD $50 million)  
 September 2023    Initial Project Description submitted to the Impact Assessment   Agency of Canada, the Government of Newfoundland and   Labrador, and the Nunatsiavut Government  
 December 2023    Newfoundland and Labrador Minister of Environment and Climate   Change directs that an environmental impact statement is required 
 6 June 2024    Impact Assessment Agency of Canada determines that a federal   impact assessment is warranted  
 2024  
 Environmental and biodiversity surveys conducted  
 8 November 2024    Joint Impact Statement Guidelines issued by the Impact Assessment Agency of Canada, Newfoundland and Labrador, and the   Nunatsiavut Government  
 20 December 2024  
 CAD $10 million Critical Minerals Infrastructure Fund contribution   announced  
 26 March 2025  
 Yves Leduc appointed Chief Executive Officer; Olga Kovalik   appointed Chief Operating Officer  
 23 June 2025  
 CAD $165 million government financing secured from Export   Development Canada and the Canada Infrastructure Bank  
 August 2025    Separation plant project notice submitted to Quebec’s Ministry of   Environment (MELCCFP)  
 26 August 2025    Offtake memorandum of understanding signed with   Vacuumschmelze in Berlin  
 28 October 2025    Maryse Bélanger appointed Chair of the Board  
 5 February 2026  
 Pre-Development Agreement with the Naskapi Nation of   Kawawachikamach announced  
 17 March 2026  
Maryse Bélanger appointed Interim Chief Executive Officer   following Yves Leduc's departure
 H1 2026  
Bankable feasibility study completed  
 10 June 2026  
Industrial partnership memorandum of understanding signed with   Schneider Electric in Paris  
 2026 (targeted)   Environmental impact assessments submitted  
 Following permitting   Construction start  
 2030 (targeted)   Commissioning  
 Sources: IAAC Registry, Reference 85969; Government of Newfoundland and Labrador, Project 2272; NRCan, CMIF announcement, 20 December 2024; CIB press release, 23 June 2025; Torngat Metals, VAC MOU, 26 August 2025; Schneider Electric MOU, 10 June 2026; Torngat Metals, leadership appointments, 26 March 2025; Torngat Metals, Bélanger appointment, 28 October 2025; Torngat Metals, CEO transition, 17 March 2026; Naskapi Nation, Pre-Development Agreement, February 2026 

 

 

Cost Summary

The total project is estimated at CAD $2 billion, of which the separation plant at Sept-Îles represents approximately CAD $800 million. 

 Funding Source  
Amount
 Date    Purpose  
Critical Minerals Infrastructure Fund (Natural Resources Canada)  
 Up to CAD $10 million    20 December 2024   Pre-construction and development activities, including seasonal access road, port facilities, and related infrastructure in Labrador  
Export Development Canada (bridge loan)  
 CAD $110 million  
 23 June 2025   Pre-construction activities  
Canada Infrastructure Bank (enabling infrastructure loan)    CAD $55 million  
 23 June 2025   Early works including utility connections, airstrip rehabilitation, and infrastructure improvements  

The Export Development Canada loan is described as the institution’s first financing of an early-stage mining project. The Canada Infrastructure Bank loan is described as its first investment in critical minerals.

Sources: Torngat Metals, CMIF announcement, 20 December 2024; Canada Infrastructure Bank, Strange Lake project page; CIB press release, 23 June 2025; Torngat Metals, separation plant; EDC, Torngat Metals financing announcement

 

Regulatory Status

The project is subject to environmental assessment by three authorities under a coordinated process.

Federal: The Impact Assessment Agency of Canada received the Initial Project Description in September 2023 and determined on 6 June 2024 that a federal impact assessment is warranted. Joint Impact Statement Guidelines were issued on 8 November 2024 in collaboration with the Government of Newfoundland and Labrador and the Nunatsiavut Government. The project is recorded on the Canadian Impact Assessment Registry under reference number 85969.

Newfoundland and Labrador: The provincial Minister of Environment and Climate Change directed on 14 December 2023 that an environmental impact statement is required. The province is participating in the joint assessment process under registration number 2272.

Quebec (separation plant): A project notice for the Sept-Îles separation plant was submitted to the Quebec Ministry of Environment, the Fight Against Climate Change, Wildlife and Parks (MELCCFP) in August 2025. The environmental impact study for the separation plant site is targeted for completion in 2026.

The feasibility study was completed in the first half of 2026. Torngat Metals is targeting submission of environmental impact assessments in 2026, with construction to begin following issuance of required permits.

Sources: IAAC, Joint Impact Statement Guidelines, 8 November 2024; Government of Newfoundland and Labrador, Project 2272; Torngat Metals, separation plant; Torngat Metals, project overview; Torngat Metals, CEO transition, 17 March 2026

 

Indigenous Participation

The project is located in the traditional territories of Nunavik Inuit communities, Nunatsiavut (Labrador Inuit), Innu Nation, the Naskapi Nation of Kawawachikamach, and NunatuKavut Community Council. Infrastructure components cross multiple Indigenous jurisdictions.

Torngat Metals states it has maintained formal engagement since 2011 with various Indigenous governments and has adopted an Indigenous, Environment, Social and Governance (IESG) approach.

Engagement activities include:

  • Multi-jurisdictional Indigenous consultation with the Nunavik regional government, the Nunatsiavut Government, Innu Nation, and the NunatuKavut Community Council
  • Pre-Development Agreement signed with the Naskapi Nation of Kawawachikamach (announced 5 February 2026), establishing a legally binding framework governing exploration and pre-development activities
  • Community engagement sessions held in Labrador since 2024, with a published report on engagement activities
  • Information and consultation sessions held for the Sept-Îles separation plant site in April 2024, September 2024, and June 2025
  • Employment priority at the mine site designated for Indigenous communities in Quebec and Labrador

Sources: Torngat Metals, communities; Torngat Metals, access road and port; Torngat Metals, separation plant; IAAC Registry, NunatuKavut submission; Naskapi Nation, Pre-Development Agreement, February 2026; Torngat Metals, Naskapi PDA announcement, 5 February 2026

 

Project Components

Mine Site and Concentration Plant (Nunavik, Quebec): The open-pit mine at Strange Lake will be served by on-site concentration facilities, a 1,500-metre airstrip, and on-site accommodation. The mine will operate year-round. Torngat Metals expects approximately 200 employees at the mine site, with recruitment priority given to Indigenous communities.

Seasonal Access Road and Port (Quebec to Labrador): A 170-kilometre single-lane seasonal access road will connect the mine site to a new port facility at Voisey’s Bay on the Labrador coast. Approximately 200,000 tonnes of rare earth concentrate per year will be packaged in sealed sea containers and transported by GPS-monitored truck convoys to the port for shipment during the ice-free season. The road is designed for seasonal use, with transport timed to avoid periods when caribou are present.

Rare Earth Separation Plant (Sept-Îles, Quebec): The separation plant will be located in the industrial zone of the port of Pointe-Noire, covering approximately 110 hectares. The plant represents an investment of approximately CAD $800 million and will produce 15,000 tonnes per year of rare earth oxides using sulphation and leaching processes. A closed-circuit system will recycle all process water. Ammonium nitrate, at approximately 55,000 tonnes per year, is produced as a by-product destined for the fertiliser market.

Sources: Torngat Metals, mine site; Torngat Metals, access road and port; Torngat Metals, separation plant

 

Rare Earth Elements

The project targets the following rare earth elements for use in permanent magnets.

Heavy Rare Earths: Dysprosium and terbium, used in permanent magnets for electric vehicle motors, wind turbine generators, and defence applications. Over 50 per cent of projected output comprises heavy rare earth elements.

Light Rare Earths: Neodymium and praseodymium, used in permanent magnets across a range of industrial, clean energy, and consumer applications.

Current global production of heavy rare earths is concentrated in China, which accounts for more than 90 per cent of supply. There are currently no rare earth mines in operation in Canada.

Sources: Torngat Metals, home page; Mining.com, 1 July 2025

 

Strategic Partnerships and Offtake

Offtake:

Vacuumschmelze (VAC): Non-binding memorandum of understanding for long-term offtake of separated rare earth oxides, signed 26 August 2025 in Berlin. VAC is described as the sole Western producer of sintered rare earth permanent magnets.  

 

Industrial Partnership:

Schneider Electric: Non-binding memorandum of understanding for a strategic industrial partnership covering electrification, automation, digital systems, and sustainable industrial design, signed 10 June 2026 in Paris on the margins of the G7 High-Level Meeting on Financing Critical Minerals Supply Chains.

Technical and Engineering Partners: (per Torngat Metals’ published partners list)

  • Corem (Quebec): Beneficiation
  • Metso (Finland/Germany): Beneficiation, selective thermal sulphation, and hydrometallurgy
  • Dorfner ANZAPLAN (Germany): Beneficiation and hydrometallurgy
  • National Research Council (Canada): Beneficiation
  • Eramet (France): Hydrometallurgy
  • Carester (France): Hydrometallurgy and separation
  • DRA Global (Montreal): Balance of plant and environmental impact assessment
  • AtkinsRéalis (Montreal): Environment and Indigenous engagement
  • Maven Water and Environment (Saskatoon): Water treatment
  • Integrated Sustainability (Calgary): Water treatment
  • Okane Consultants (Saskatoon): Water treatment

Sources: Torngat Metals, VAC MOU, 26 August 2025; Schneider Electric / Torngat Metals MOU, BusinessWire, 10 June 2026; Torngat Metals, advisory board and partners

 

Resources